Pace Digitek wins SECI order for 1,200 MWh BESS in Andhra Pradesh
Pace Digitek has received an order from the Solar Energy Corporation of India (SECI) to supply a 600 MW/1,200 MWh standalone grid-connected battery energy storage system in Andhra Pradesh. The project, valued at about Rs 11.59 billion, was tendered in August 2025. The company’s scope includes the design and engineering of the entire system along with its associated components. This covers the supply of BESS direct-current blocks integrated with heating, ventilation, air conditioning, and fire…

