ReNew to set up 2,800 MW hybrid power project with BESS in Andhra Pradesh
ReNew Power Ventures Private Limited plans to develop a 2,800 MW wind-solar hybrid power project with a 2,000 MWh Battery Energy Storage System (BESS) in Anantapur, Andhra Pradesh. The foundation stone will be laid on May 16, 2025. The project will be executed in two phases: Phase I will include 587 MW solar, 250.8 MW wind, and a 415 MWh BESS system. Phase II will include 1,213 MW solar, 749.2 MW wind, and a 1,585…