PM Modi inaugurates 140 MWp solar project in Maharashtra
Author: PPD Team Date: September 29, 2025
Author: PPD Team Date: September 29, 2025
Prime Minister Narendra Modi has inaugurated Sunstream Green Energy’s 140 MWp solar power project in Maharashtra. The launch formed part of 2,458 MW of renewable energy capacity unveiled across the country.
Alongside the inauguration, Sunstream Green Energy announced plans to develop a 1 GW portfolio of operating renewable energy assets within the next 18 to 24 months. The company currently has 500 MW in its pipeline, of which 250 MW is operational and 250 MW is under construction.
Sunstream Green Energy was founded in 2019 by Bhadra Kanaiya and is backed by Lighthouse Trust, a Singapore-based growth fund focused on emerging markets. According to the company, its focus is on supplying distributed renewable power to utility and corporate and industrial customers.
The company operates 250 MW of commissioned capacity and another 250 MW under execution
Author: PPD Team Date: April 28, 2025 CSE Development (India) Private Limited has commissioned several solar photovoltaic (PV) power projects at its 100 MWp solar park in Maharashtra on April 23, 2025. The power generated from these open access captive solar projects will be supplied to various clients, including fast-moving consumer goods (FMCG) companies and DRT-Anthea Aroma Chemicals Private Limited.
Author: PPD Team Date: January 20, 2026 India’s power distribution utilities have reported a consolidated Profit After Tax (PAT) of Rs 2,701 crore in FY 2024–25, marking a shift after several years of losses. The figures cover distribution companies and power departments and were released by the Ministry of Power on 18 January 2026. The sector’s return to profitability contrasts with a loss of Rs 25,553 crore in FY 2023–24 and a loss of Rs…
Author: PPD Team Date: May 5, 2025 JSW Neo Energy Limited, a subsidiary of JSW Energy, has signed a power purchase agreement (PPA) with Uttar Pradesh Power Corporation Limited (UPPCL) for 1,500 MW/12,000 MWh of pumped hydro storage projects (PHSPs) in Sonbhadra district, Uttar Pradesh. The agreement spans 40 years with a fixed annual capacity charge of Rs 7.72 million per MW. The PHSPs will enable a scheduled discharge of 8 hours per day, with…
Author: PPD Team Date: September 26, 2025 NTPC Limited and NTPC Green Energy Limited have declared new solar capacities operational in Rajasthan and Gujarat, respectively. NTPC has commissioned 167 megawatts (MW) out of 245 MW at Plot-1 of its Nokh Solar PV Project (3×245 MW) in Rajasthan, effective 26 September 2025, 00:00 hours. The project is implemented under the Central Public Sector Undertaking (CPSU) Scheme Phase-II, Tranche-III. Following this addition, NTPC’s total installed and commercial…
Author: PPD Team Date: February 10, 2025 Torrent Power has announced its financial results for the third quarter of FY 2024-25, ending December 31, 2024. The company reported a 31% year-on-year increase in profit after tax (PAT), reaching Rs 4.89 billion. The growth in PAT was largely driven by increased power demand during colder weather conditions and a one-time gain of Rs 770 million from cable sales, which contributed to a rise in other income….
Author: PPD Team Date: December 11, 2024 Juniper Green Energy has signed an agreement with First Solar to procure 1 GW of advanced Series 7 FT1 cadmium telluride (CdTe) thin-film photovoltaic (PV) modules. The modules will be supplied over two years and deployed across Juniper Green Energy’s projects in Rajasthan, Gujarat, and Maharashtra during the upcoming financial year. The modules will be manufactured at First Solar’s facility in Chennai, reducing reliance on China’s crystalline silicon…