Similar Posts
NHPC begins operations for 31 MW solar capacity in Bikaner
NHPC Limited has started commercial operations for 31 MW of solar capacity under its 1,000 MW grid-connected solar PV power project (CPSU Tranche-III) in Bikaner, Rajasthan. The milestone was achieved on March 31, 2025. The project is being executed in phases, with full commissioning expected by August 2025. A 300 MW part of the project…
Alpex Solar to expand UP cell plant to 2.2 GW
Alpex Solar Limited has approved the expansion of its proposed solar cell manufacturing facility in Kosi Kotwan, Uttar Pradesh, from 1.6 GW to 2.2 GW. The company will also adopt advanced G12R tunnel oxide passivated contact (TOPCon) technology as part of the upgrade. The total capital expenditure for the expansion and technology transition is estimated…
NTPC and ONGC establish JV for renewable energy projects
NTPC Green Energy Limited (NGEL), a subsidiary of NTPC, and ONGC Green Energy Limited (OGL), a subsidiary of Oil and Natural Gas Corporation (ONGC), have formed a 50:50 joint venture named ONGC NTPC Green Private Limited (ONGPL). The Ministry of Power approved the formation of this joint venture, which has an authorised capital of Rs…
Indus Towers invests in 50 MW captive solar project
Indus Towers Limited (ITL) has signed an agreement with Amplus Energy Solutions Private Limited to set up a 50 MW captive solar photovoltaic (PV) power project in India. As part of the agreement, ITL will invest Rs 270 million to acquire a 26 per cent equity stake in Amplus Tungabhadra Private Limited, the special purpose…
Pace Digitek targets 10 GWh BESS capacity by October 2026, eyes cell manufacturing entry
Pace Digitek Limited said it is accelerating its expansion in the Battery Energy Storage System (BESS) manufacturing segment and is targeting 10 GWh of operational capacity by October 2026, ahead of its earlier timeline, according to statements made during the company’s investor call held on May 26, 2026. The company currently operates a 2.5 GWh…
BHEL wins Rs 67 billion contract for Singareni Stage-II project
Bharat Heavy Electricals Limited (BHEL) has received a Letter of Intent (LOI) worth Rs 67 billion from Singareni Collieries Company Limited (SCCL) for the engineering, procurement, and construction (EPC) package of the 1×800 MW Singareni Stage-II project, also known as the Adilabad Coal-Based Power Project Stage II. SCCL re-invited bids for the project in March…
