Similar Posts
JSW Energy signs first FDRE power deal with SECI
JSW Energy’s unit, JSW Neo Energy, has signed a 25-year power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) to supply 230 megawatts (MW) of firm and dispatchable renewable energy (FDRE) from interstate transmission system (ISTS)-connected projects across India. The PPA, secured under SECI’s FDRE Tranche IV scheme, is JSW’s first agreement…
Adani Green withdraws from two wind projects in Sri Lanka
Adani Green Energy, part of India’s Adani Group, has decided to withdraw from two proposed wind power projects in Sri Lanka due to financial challenges. The decision follows recent discussions with the Sri Lankan government regarding the reduction of power generation costs. Sri Lanka’s capital, Colombo, had aimed to lower the cost of power to…
Over 55 governments back framework to expand pumped storage hydropower
A new framework to accelerate pumped storage hydropower has received support from more than 55 governments and international organisations. The move aims to strengthen clean energy systems globally. The Global Alliance for Pumped Storage (GAPS), which was created at COP29 in Baku, confirmed the adoption of its governing Principles at the International Forum on Pumped…
Uttar Pradesh opens first green hydrogen plant in Gorakhpur
Uttar Pradesh Chief Minister Yogi Adityanath, on August 17, 2025, inaugurated the state’s first green hydrogen plant at Khanimpur village in Gorakhpur district. The facility, set up by Torrent Gas and Torrent Power, is the second of its kind in India. The project has been designed to produce 72,000 tonnes of green hydrogen annually. In…
GE Vernova T&D India to supply power transformers for Khavda project
GE Vernova T&D India Limited has secured an order from Sterlite Power for the supply and supervision of 765 kV power transformers and reactors for the Khavda project. The contract, valued at approximately Rs 4 billion, is scheduled to be completed within two years.
Waaree Renewable revises solar project capacity and order value
Waaree Renewable Technologies Limited has informed the stock exchanges of a revision to the capacity and value of a previously announced solar project. The disclosure was made through a regulatory filing dated 8 January 2026. The revision relates to a project award first disclosed on 9 September 2025. The company stated that it has received…
