Eastman Auto partners with Urja Mobility for lithium-ion battery technology
Author: PPD Team Date: February 13, 2025
Author: PPD Team Date: February 13, 2025
Eastman Auto and Power Limited (EAPL), through its subsidiary Eastman New Energy Private Limited, has signed a Memorandum of Understanding (MoU) with MTOW Mobility Private Limited (Urja Mobility) to collaborate on developing and deploying lithium-ion battery technology for India’s growing electric vehicle (EV) market.
As part of the partnership, Urja Mobility has committed to sourcing over 20,000 lithium-ion batteries from Eastman to support its nationwide battery leasing initiatives. Additionally, Eastman will integrate Urja Mobility’s IoT and software solutions into its lithium battery products, enabling remote monitoring and analytics to improve operational efficiency.
By combining Eastman’s lithium-ion battery manufacturing expertise with Urja Mobility’s innovative battery leasing model, the partnership aims to advance the sustainability and performance of electric transportation in India.
Founded in 2006, EAPL is a leader in the energy transition sector, providing solutions in last-mile e-mobility, solar power, and energy storage. The company offers a range of energy solutions, including technology-agnostic storage systems and power conversion products for solar and backup applications. EAPL operates with an annual production capacity of 25 GW and a presence in over 50 countries.
Author: PPD Team Date: April 9, 2025 Websol Energy Systems Private Limited has signed a purchase agreement with Luminous Power Technologies Private Limited for the supply of 100 MW of MONO PERC solar cells. The agreement was signed on April 5, 2025. The supply is scheduled to take place over a one-year period, from April 2025 to April 2026. The solar cells are expected to have an efficiency range of 23% to 23.4%. This order…
Author: PPD Team Date: December 19, 2024 Power Grid Corporation of India Limited (PGCIL) has approved raising up to Rs 42.50 billion through the private placement of bonds. The funds will be raised under the Powergrid bonds – LXXX (80th Issue), which are unsecured, non-convertible, non-cumulative, redeemable, and taxable. The issue includes a base size of Rs 10 billion and a green shoe option of Rs 32.50 billion. These bonds will have a 10-year tenure…
Author: PPD Team Date: April 2, 2026 Solarium Green Energy Limited has received a letter of award to execute end-to-end engineering, procurement and construction (EPC) works for a 50 MWac solar photovoltaic (PV) project in Maharashtra, the Ahmedabad-based company said on April 1, 2026. The contract, valued at approximately Rs 188.525 crore excluding goods and services tax (GST), also includes three years of operations and maintenance services. Solarium is acting as a subcontractor on a…
Author: PPD Team Date: July 28, 2025 India’s first tender for small nuclear reactors aimed at high-emission industries has drawn interest from major private companies. The project could lead to investments worth up to Rs 50,000 crore. Nuclear Power Corporation of India Ltd (NPCIL) has invited bids to build Bharat Small Reactors (BSRs) with a capacity of 220 megawatts (MW) each, intended for use in sectors such as steel and aluminium. The bid submission deadline…
Author: PPD Team Date: May 12, 2025 Adani Group has signed a memorandum of understanding (MoU) with Bhutan’s Druk Green Power Corporation (DGPC) to jointly develop 5 GW of hydropower capacity in Bhutan. This includes ongoing work on the 570/900 megawatt (MW) Wangchhu Hydropower Project. DGPC will hold a 51% majority stake in the projects, while Adani will hold the remaining 49%. Under the agreement, Adani will manage power offtake and integrate the generated power…
Author: PPD Team Date: January 15, 2025 Hinduja Renewables Energy Private Limited received a Letter of Award (LoA) on January 6, 2025, for the 600 MW Jhansi Solar Power Park Project in Uttar Pradesh. TUSCO Limited, a joint venture of UPNEDA and THDC India Limited, invited bids for Solar Power Developers (SPDs) in August 2024. The project involves constructing cable trays, internal drainage systems, 33kV cables, land levelling, and installing power generation equipment. It also…