Punjab’s largest solar group captive project to power Swaraj Tractors’ facilities
Author: PPD Team Date: April 3, 2025
Author: PPD Team Date: April 3, 2025
Swaraj Tractors has partnered with Mahindra Susten to develop a 26 MW solar project in Bathinda district, marking Punjab’s largest solar group captive project. This initiative aims to increase Swaraj Tractors’ renewable energy share to up to 50 per cent.
The project, undertaken by Mahindra Susten, will supply clean energy to four Swaraj Tractors manufacturing facilities in Mohali and Dera Bassi. It is expected to generate 60 million kWh of renewable electricity annually, reducing around 54,600 tonnes of carbon emissions.
This project also marks Mahindra Susten’s entry into Punjab, strengthening its presence as a renewable independent power producer.
Swaraj Tractors, established in 1974, is the tractor manufacturing division of the Mahindra Group. It produces tractors ranging from 11.2 kW to 49.2 kW, supporting farming solutions and horticulture mechanisation.
Author: PPD Team Date: January 24, 2025 CleanMax has secured a long-term credit facility of AED 99 million from Hong Kong and Shanghai Banking Corporation (HSBC) to develop and finance its onsite solar portfolio in the UAE. The facility will support the installation of 92 solar assets across industrial facilities, malls, schools, and universities. Additionally, the financing includes an uncommitted accordion of AED 37 million for future projects, in line with the UAE’s Net Zero…
Author: PPD Team Date: March 25, 2026 Delhi Chief Minister and Finance Minister Rekha Gupta has allocated Rs 3,942 crore to the Power Department in the Rs 1,03,700 crore Budget for 2026-27, presented on March 24, 2026. The budget positions itself as Delhi’s first Green Budget, with 21.44% of total outlay, or Rs 22,236 crore, earmarked for green initiatives. Solar push and network upgrades The government will continue electricity subsidies while expanding solar adoption through…
Author: PPD Team Date: November 20, 2024 NTPC Vidyut Vyapar Nigam (NVVN) has awarded contracts totalling 66 MW of solar capacity to Kirloskar Solar Technologies and Oriana Power. The projects, valued at Rs 2.91 billion, will be developed across multiple Indian states. Kirloskar Solar Technologies received contracts for 32.29 MW of ground-mounted solar projects and 14.74 MW of rooftop solar installations, amounting to Rs 2.08 billion. These projects will be set up in Chhattisgarh, Madhya…
Author: PPD Team Date: October 3, 2025 Indian Renewable Energy Development Agency Limited (IREDA) has reported strong growth in its key business indicators for the half year ended September 30, 2025, based on provisional data. Loan sanctions rose by 86 per cent to Rs 331.48 billion in H1 FY 2025-26, up from Rs 178.60 billion in the same period last year. Loan disbursements increased by 54 per cent to Rs 150.43 billion, compared to Rs…
Author: PPD Team Date: June 23, 2025 Rajesh Power Services Limited has secured a Rs 597.9 million contract from GIFT Power Company Limited to develop distribution and backup power systems in GIFT City, Gandhinagar. The project covers both the Special Economic Zone (SEZ) and Domestic Tariff Area (DTA). The contract includes three key components. Part A focuses on setting up grid power supply infrastructure in the SEZ. Part B involves installing backup power systems for…
Author: PPD Team Date: November 6, 2024 Apollo Green Energy is set to establish a 500 MW solar module plant within the next two to three years, aligning with India’s target to reach 500 GW of renewable capacity by 2030, up from the current 154 GW. The company, specializing in renewable projects, has an order book of Rs 35 billion (USD 416 million) and aims to expand it to Rs 100 billion within this financial…