NLC India Limited has issued an Expression of Interest (EoI) for the engineering, procurement, and construction (EPC) package for the 3×125 MW Gurha Thermal Power Project. 

The EoI was announced on December 16, 2024, with a bid submission deadline of January 30, 2025.

The project will be executed by a joint venture of NLC India and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RRVUNL) at Chak Madhogarh village in Bikaner district, Rajasthan.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *