Author: PPD Team Date: 12/12/2024
Similar Posts
KPI Green terminates 66.2 MW CPP hybrid project with Sai Infinium
Author: PPD Team Date: 09/04/2025 KPI Green Energy Limited has terminated the Letter of Award (LoA) it received from Sai Bandhan Infinium Private Limited for developing a 66.2 MW wind-solar hybrid power project. The decision was made due to changes in technical requirements after the LoA was issued. The LoA was awarded in September 2024. The project was to be developed under the Captive Power Producer (CPP) segment and completed in tranches by July 2025….
ITC commissions second offsite solar plant in Karnataka
Author: PPD Team Date: 18/10/2024 ITC has commissioned a 9.45 MW offsite solar plant in Davangere district, Karnataka, marking its second such facility in the state and fourth in the country, alongside others in Tamil Nadu, Uttar Pradesh, and Karnataka. The plant is designed to generate around 15 million units of green energy annually, supplying power to ITC’s hotels, the ITC Life Sciences and Technology Centre (LSTC), food manufacturing units in Mysore and Malur, and…
Adani Energy forms SPV for power T&D
Author: PPD Team Date: 20/12/2024 Adani Energy Solutions Limited (AESL) incorporated Adani Energy Solutions Step-Ten Limited (AESSTL) on December 18, 2024. The special purpose vehicle (SPV) will focus on the transmission, distribution, and supply of power, along with other infrastructure services.
EU to provide €30m aid to Moldova for energy crisis relief
Author: PPD Team Date: 29/01/2025 The EU will offer €30m ($31.4m) in emergency assistance to Moldova, including the separatist Transnistrian region, until 10 February 2025. The aid follows Russian gas supplier Gazprom’s failure to deliver natural gas, leaving over 350,000 people without electricity and heating. Moldova declared a 60-day national state of emergency starting 16 December 2024 due to expected gas cuts. The package will support electricity restoration and explore coal deliveries from Ukraine. It…
NLC India reports Rs 9.82 billion net profit for Q2FY25
Author: PPD Team Date: 30/10/2024 NLC India Limited has posted a net profit of Rs 9.82 billion for the quarter ending September 2024, marking a 9.58% decrease from the Rs 10.86 billion reported in the same period last year. However, the company’s total income rose by approximately 35%, reaching Rs 43.70 billion for the quarter, compared to Rs 32.34 billion in the corresponding period of the previous year.
Om Infra secures Rs 4.1 billion H&M contract for Kwar HEP
Author: PPD Team Date: 28/10/2024 Om Infra has been awarded a contract valued at Rs 4.1 billion for hydro-mechanical (H&M) works on the 540 MW Kwar hydroelectric power project in Jammu & Kashmir by Chenab Valley Power Projects. The contract includes the complete HM scope, covering procurement, manufacturing, inspection, assembly, testing, painting, transportation, storage, site erection, and commissioning of equipment such as radial gates, stoplogs, gantry cranes, trash racks, and steel liners for pressure shafts. …
KPI Green terminates 66.2 MW CPP hybrid project with Sai Infinium
Author: PPD Team Date: 09/04/2025 KPI Green Energy Limited has terminated the Letter of Award (LoA) it received from Sai Bandhan Infinium Private Limited for developing a 66.2 MW wind-solar hybrid power project. The decision was made due to changes in technical requirements after the LoA was issued. The LoA was awarded in September 2024. The project was to be developed under the Captive Power Producer (CPP) segment and completed in tranches by July 2025….
ITC commissions second offsite solar plant in Karnataka
Author: PPD Team Date: 18/10/2024 ITC has commissioned a 9.45 MW offsite solar plant in Davangere district, Karnataka, marking its second such facility in the state and fourth in the country, alongside others in Tamil Nadu, Uttar Pradesh, and Karnataka. The plant is designed to generate around 15 million units of green energy annually, supplying power to ITC’s hotels, the ITC Life Sciences and Technology Centre (LSTC), food manufacturing units in Mysore and Malur, and…
Adani Energy forms SPV for power T&D
Author: PPD Team Date: 20/12/2024 Adani Energy Solutions Limited (AESL) incorporated Adani Energy Solutions Step-Ten Limited (AESSTL) on December 18, 2024. The special purpose vehicle (SPV) will focus on the transmission, distribution, and supply of power, along with other infrastructure services.
EU to provide €30m aid to Moldova for energy crisis relief
Author: PPD Team Date: 29/01/2025 The EU will offer €30m ($31.4m) in emergency assistance to Moldova, including the separatist Transnistrian region, until 10 February 2025. The aid follows Russian gas supplier Gazprom’s failure to deliver natural gas, leaving over 350,000 people without electricity and heating. Moldova declared a 60-day national state of emergency starting 16 December 2024 due to expected gas cuts. The package will support electricity restoration and explore coal deliveries from Ukraine. It…
NLC India reports Rs 9.82 billion net profit for Q2FY25
Author: PPD Team Date: 30/10/2024 NLC India Limited has posted a net profit of Rs 9.82 billion for the quarter ending September 2024, marking a 9.58% decrease from the Rs 10.86 billion reported in the same period last year. However, the company’s total income rose by approximately 35%, reaching Rs 43.70 billion for the quarter, compared to Rs 32.34 billion in the corresponding period of the previous year.
Om Infra secures Rs 4.1 billion H&M contract for Kwar HEP
Author: PPD Team Date: 28/10/2024 Om Infra has been awarded a contract valued at Rs 4.1 billion for hydro-mechanical (H&M) works on the 540 MW Kwar hydroelectric power project in Jammu & Kashmir by Chenab Valley Power Projects. The contract includes the complete HM scope, covering procurement, manufacturing, inspection, assembly, testing, painting, transportation, storage, site erection, and commissioning of equipment such as radial gates, stoplogs, gantry cranes, trash racks, and steel liners for pressure shafts. …
KPI Green terminates 66.2 MW CPP hybrid project with Sai Infinium
Author: PPD Team Date: 09/04/2025 KPI Green Energy Limited has terminated the Letter of Award (LoA) it received from Sai Bandhan Infinium Private Limited for developing a 66.2 MW wind-solar hybrid power project. The decision was made due to changes in technical requirements after the LoA was issued. The LoA was awarded in September 2024. The project was to be developed under the Captive Power Producer (CPP) segment and completed in tranches by July 2025….
ITC commissions second offsite solar plant in Karnataka
Author: PPD Team Date: 18/10/2024 ITC has commissioned a 9.45 MW offsite solar plant in Davangere district, Karnataka, marking its second such facility in the state and fourth in the country, alongside others in Tamil Nadu, Uttar Pradesh, and Karnataka. The plant is designed to generate around 15 million units of green energy annually, supplying power to ITC’s hotels, the ITC Life Sciences and Technology Centre (LSTC), food manufacturing units in Mysore and Malur, and…