SPPC awards 7.2GW power project contracts under Saudi Vision 2030
Author: PPD Team Date: November 12, 2024
Author: PPD Team Date: November 12, 2024
The Saudi Power Procurement Company (SPPC) has awarded contracts for the development of 7.2GW of power projects to consortiums led by Saudi Electricity Company and Abu Dhabi National Energy Company (Taqa).Â
The projects, essential to Saudi Arabia’s strategic energy mix plan, align with Vision 2030 and the Saudi Green Initiative, which targets a 50% contribution each from renewable energy and gas in domestic electricity production.
Contracts were awarded for the Rumah I and II and Al Nairyah I and II projects, each with a capacity of 1.8GW.Â
A consortium of Saudi Electricity Company, Acwa Power, and Korea Electric Power Corporation (KEPCO) will lead Rumah I and Nairyah I, while Taqa, Jera, and Al Bawani will oversee Rumah II and Nairyah II.Â
Each project is structured as a 25-year build, own, and operate (BOO) agreement, with total investments of approximately SR30 billion ($8 billion).
Upon completion, these projects are expected to supply electricity to around three million households annually. The initiative includes localisation of gas turbine manufacturing and readiness for carbon capture, supporting Saudi Arabia’s net-zero greenhouse gas emissions target by 2060.
Author: PPD Team Date: June 3, 2025 Adani Energy Solutions Limited (AESL) has secured the transmission project to evacuate power from 1,500 MW pumped storage projects (PSPs) near Talegaon, Maharashtra. REC Power Development and Consultancy Limited (REC PDCL) invited bids in October 2024. AESL emerged as the lowest bidder, quoting Rs 16.6 billion, with fixed transmission charges of Rs 2.21 billion. Competing bidders in the technical round included Power Grid Corporation of India Limited (PGCIL)…
Author: PPD Team Date: July 31, 2025 Power Finance Corporation Ltd (PFC) has transferred its subsidiary, Angul Sundargarh Transmission Ltd, to HG Infra Engineering Ltd. Angul Sundargarh Transmission Ltd is a special purpose vehicle (SPV) for the Eastern Region Generation Scheme-I (ERGS-I), a central transmission project. The handover was completed on July 28, 2025, under a signed Share Purchase Agreement. The selection was based on tariff-based competitive bidding. HG Infra emerged as the lowest bidder…
Author: PPD Team Date: February 12, 2025 Researchers from Guilin University of Electronic Technology, China, developed a numerical model to assess how different overhead heights and tilt angles of photovoltaic (PV) modules influence thermal and electrical performance, as well as energy-saving in buildings. The model, validated through experiments, fills a gap in the literature by providing a comprehensive study on the impact of these factors across various installation types. Using the Design Builder software, the…
Author: PPD Team Date: February 28, 2025 Madhya Pradesh has secured further investments in renewable energy (RE) through new Memorandums of Understanding (MoUs) signed at the Global Investors Summit 2025. At the summit, five companies formalized their investment plans: KP Group committed to a 1,800 MW RE project, including solar, wind, wind-solar hybrid, biomass, and battery energy storage system (BESS) projects. Four Square Green Energy Private Limited signed an MoU worth Rs 50.05 billion for…
Author: PPD Team Date: November 21, 2024 President-elect Donald Trump has appointed Chris Wright, a veteran of the US energy sector and CEO of Liberty Energy, as the next energy secretary. Wright is recognised as a pioneer of the American shale revolution, having played a crucial role in advancing hydraulic fracturing technologies that reshaped the global energy landscape. Wright brings decades of experience to the role. He founded and currently serves as the CEO of…
Author: PPD Team Date: January 22, 2026 ReNew Energy Global PLC is preparing to raise around $500 million through a U.S. dollar-denominated bond issuance routed via the International Financial Services Centre (IFSC) at Gujarat International Finance Tec-City (GIFT City). The proposed issue is aimed at refinancing existing debt, including a major maturity due in July 2026, and meeting other corporate funding needs. According to the proposed structure, the proceeds will be used for on-lending to…