|

THDC begins draft tube installation at 444 MW Vishnugad Pipalkoti HEP

THDC India Limited has commenced the installation of the draft tube in Unit 1 of the 444 MW Vishnugad Pipalkoti hydroelectric project (HEP) on the Alaknanda River in Uttarakhand. The draft tube plays a key role in directing water that has passed through the turbine back into the river, maintaining pressure and enabling energy recovery, which is crucial for optimizing the efficiency of power generation. The project is situated near Helong village.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *