|

PVUNL achieves rail connectivity for Patratu Thermal Power Project

Patratu Vidyut Utpadan Nigam Limited (PVUNL) successfully conducted a trial run for rail connectivity of the Patratu Thermal Power Project Phase I on January 21, 2025.  The project, located in Ramgarh district, Jharkhand, is expected to be commissioned by December 2025. PVUNL, a special purpose vehicle (SPV) formed by NTPC Limited in a joint venture with Jharkhand Bijli Vitran Nigam Limited (JBVNL), is developing the project.  Phase I involves three 800 MW units, with a…

|

PVUNL to commission Phase-1 power units by December 2025

Patratu Vidyut Utpadan Nigam (PVUNL), a joint venture of NTPC and Jharkhand Bijli Vitran Nigam (JBVNL), will commission its Phase-1 power units by December 2025.  Located in Ramgarh district, Phase-I consists of three 800 MW units, collectively generating 2,400 MW. The first unit is set to begin operations in January 2025, followed by the second in September and the third in December. Of the total output, 85%—over 2,000 MW—will be supplied to Jharkhand, significantly enhancing…