Adani, Azure, ACME plants found non-compliant after grid disturbances
The Northern Regional Load Despatch Centre (NRLDC) has identified multiple renewable energy generating stations that failed to comply with Low Voltage Ride Through (LVRT) and High Voltage Ride Through (HVRT) requirements during two major grid disturbance events in April and May 2026. The findings were presented during the latest meeting of the Renewable Energy Sub-Committee…
