L&T and NTPC post Q1 results
Author: PPD Team Date: July 30, 2025
Author: PPD Team Date: July 30, 2025
Larsen & Toubro (L&T) reported a consolidated net profit of Rs 3,617 crore for the quarter ended June 2025, marking a 29.9 per cent increase from Rs 2,786 crore a year earlier. Revenue rose 15.5 per cent year-on-year to Rs 63,678 crore.
Earnings before interest, tax, depreciation and amortisation (EBITDA) stood at Rs 6,316 crore, up 12.5 per cent from Rs 5,615 crore. However, operating margin declined slightly to 9.9 per cent from 10.2 per cent in the same quarter last year.
Meanwhile, NTPC posted a net profit of Rs 4,774 crore, up 5.85 per cent from Rs 4,511 crore a year ago. Revenue dropped 4.2 per cent to Rs 42,572 crore from Rs 44,427 crore.
The company’s EBITDA fell 17.4 per cent year-on-year to Rs 10,283 crore. Operating margin also narrowed to 24.1 per cent from 28 per cent in the year-ago quarter.
Author: PPD Team Date: May 26, 2025 Multi Infrastructure and Engineering Private Limited (MIEPL) has secured a contract from Central Electronics Limited (CEL) to set up a 200 MW solar module manufacturing facility in Ghaziabad, Uttar Pradesh. The project tender was floated by CEL in April 2025. It will be implemented on a revenue-sharing model under the Make in India initiative. MIEPL stated that the new facility will help scale up domestic solar module production….
Author: PPD Team Date: June 5, 2025 Serentica Renewables India Private Limited (SRIPL) has achieved financial closure for its 300 MW solar power project in Rajasthan. The company has secured over Rs 8.58 billion (USD 100 million) through External Commercial Borrowing (ECB) from Rabobank and Societe Generale. The power generated from this project will be supplied to Bharat Aluminium Company Limited (BALCO), a wholly-owned subsidiary of Vedanta Limited. This forms part of Vedanta’s broader plan…
Author: PPD Team Date: December 23, 2025 On 22 December 2025, Matrix Renewables said it had signed a full Engineering, Procurement, and Construction (EPC) agreement with Tesla for a standalone battery energy storage system. The project has a capacity of 500 MW with a two hour duration, equivalent to 1 GWh, and is located in Eccles, Scotland. This is Matrix Renewables’ first standalone battery energy storage system (BESS) project in the UK. The company said…
Author: PPD Team Date: December 23, 2025 Saatvik Green Energy Limited said its material subsidiary, Saatvik Solar Industries Private Limited, has received and accepted an order worth Rs 486 crore from a domestic independent power producer and engineering, procurement, and construction player for the supply of solar photovoltaic modules. The commercial order is scheduled to be executed by December 2026. Separately, Saatvik Green Energy Limited has received an order from Maharashtra State Electricity Distribution Co….
Author: PPD Team Date: June 13, 2025 Union Minister of Power and Housing & Urban Affairs, Shri Manohar Lal, reviewed the power and urban development sector in Jammu & Kashmir during his visit to Srinagar. He urged the Union Territory (UT) to consider waiving the water cess on hydro projects to lower electricity costs for consumers. The Union Minister inaugurated several transmission infrastructure upgrades, including: 132/33 kV Grid Station, Awantipora – Capacity increased from 145…
Author: PPD Team Date: October 22, 2025 Avaada Electro, the solar manufacturing subsidiary of the Brookfield-backed Avaada Group, has filed confidential documents with the Securities and Exchange Board of India (SEBI) to raise between Rs 90–100 billion through an initial public offering (IPO). The proposed IPO is expected to include both fresh equity issuance and an offer for sale by existing shareholders. According to market sources, the company is targeting a valuation in the range…