K.P. Energy wins LoA for 40.8 MW hybrid project in Gujarat
Author: PPD Team Date: February 27, 2026
Author: PPD Team Date: February 27, 2026
K.P. Energy Limited has received a letter of award (LoA) from Enerparc Energy Private Limited for the development of a 40.8 MW wind-solar hybrid power project in Gujarat. The project will be executed on a complete turnkey basis.
The hybrid project includes around 20.2 MW of wind capacity and 20.6 MWp of solar capacity. The award covers end-to-end development, including supply, installation, and commissioning of the project.
Under the LoA, K.P. Energy will develop the evacuation infrastructure, facilitate grid connectivity, and secure all required statutory and regulatory approvals. The company confirmed receipt of the LoA in a disclosure and stated that execution will be undertaken on a turnkey basis.
The featured photograph is for representation only.
Author: PPD Team Date: May 7, 2025 On May 1, 2025, the World Bank’s Board of Executive Directors approved a €79.90 million loan and €2.89 million grant to support Bosnia and Herzegovina’s National Energy and Climate Plan. This funding aims to enhance energy security, promote economic transition, and create job opportunities in regions shifting away from coal. The Just Transition in Select Coal Regions of Bosnia and Herzegovina Project will focus on repurposing post-mining lands…
Author: PPD Team Date: May 13, 2025 Venus Pipes & Tubes Limited received a Letter of Intent (LoI) worth Rs 1,900 million on May 8, 2025, for the supply of stainless steel seamless boiler tubes. These will be used in a series of supercritical and subcritical thermal power projects. The execution period for the project is estimated to be 12 to 15 months. Venus Pipes is an Indian manufacturer and exporter of stainless steel pipes…
Author: PPD Team Date: March 16, 2026 Coal India Limited (CIL) has informed stock exchanges that Central Mine Planning and Design Institute Limited (CMPDIL), its wholly owned subsidiary, filed a Red Herring Prospectus (RHP) dated March 12, 2026 with the Securities and Exchange Board of India (SEBI), BSE Limited (BSE), and the National Stock Exchange of India Limited (NSE) for a proposed initial public offering (IPO). The proposed IPO is structured entirely as an offer…
Author: PPD Team Date: December 30, 2024 The government has annulled the auction of 11 critical mineral blocks in the fourth round due to a weak response from bidders. Four blocks, including tungsten and glauconite located in Chhattisgarh and Arunachal Pradesh, attracted no bids, while the remaining seven received fewer than three technically qualified bidders, leading to the cancellation of the auction process for all blocks. This follows a pattern seen in previous rounds, where…
Author: PPD Team Date: October 30, 2025 India’s renewable energy companies reported solid financial performance for FY 2025-26, driven by higher earnings and improved margins. NTPC Green Energy reported a net profit of Rs 88 crore, up from Rs 38 crore the previous year. Revenue grew 21.5% to Rs 612.3 crore, and EBITDA rose 26% to Rs 529.6 crore. Margins improved to 86.5% from 83.4%. Adani Green Energy reported a 25% rise in net profit…
Author: PPD Team Date: May 7, 2025 NTPC Renewable Energy Limited has commenced commercial operations of the final 60 MW at Limbdi, Gujarat, under the 150 MW Gujarat Solar PV Project – Phase XII. With this, the full capacity of the project is now operational. The project, awarded under Phase XII of Gujarat Urja Vikas Nigam Limited (GUVNL), is spread across three sites. It includes 60 MW at Radhanpur in Patan district, 30 MW at…