Author: PPD Team Date: 20/02/2025

Similar Posts

India surpasses 200 GW renewable energy milestone
Author: PPD Team Date: 15/10/2024 India has crossed a major milestone in its renewable energy journey, with the nation’s total renewable energy capacity reaching 201.45 GW as of October 10, 2024, according to the Central Electricity Authority (CEA). When including the 8,180 MW of nuclear power, non-fossil fuel-based energy now accounts for nearly half of India’s total installed electricity generation capacity, which stands at 452.69 GW. Solar power leads India’s renewable energy contributions, generating 90.76…

Status of solar parks and UMREPPs across India as of March 2025
Author: PPD Team Date: 22/05/2025 This table shows the current status of 55 solar parks and Ultra Mega Renewable Energy Power Projects (UMREPPs) across 15 states in India. It captures capacity, expected or actual completion dates, and key development milestones such as transmission progress, land acquisition, and commissioning status. Abbreviations used: APGENCO: Andhra Pradesh Power Generation Corporation APSPCL: Andhra Pradesh Solar Power Corporation Private Limited CEA: Central Electricity Authority CTU: Central Transmission Utility CTUIL: Central…

India’s short-term power trading market grows 12% in FY24
Author: PPD Team Date: 07/11/2024 Power trading in India’s short-term market rose by 12% in FY24, reaching 218.22 billion units (BU) from 194.35 BU in FY23, as reported by the Central Electricity Regulatory Commission (CERC). Short-term transactions, including deviation settlement mechanism (DSM) volumes, consist of contracts under one year, executed bilaterally or through power exchanges, representing 12.5% of the country’s total electricity generation. The remaining 87.5% was sourced through long-term contracts and intra-state transactions…

10,273 ckm of Lines and 71,197 MVA Added: T&D in 2024
Author: PPD Team Date: 06/01/2025 Year-end review: Power transmission and distribution in India National Electricity Plan 2023-2032 The Government of India has finalized the National Electricity Plan for the period 2023-2032 to address a projected peak demand of 458 GW by 2032, with an estimated total investment of Rs 9.15 trillion. In the new plan, the transmission network will grow from 491,000 ckm in 2024 to 648,000 ckm by 2032, while transformation capacity will increase…

Street light installations across States and Union Territories
Author: PPD Team Date: 15/04/2025 Since FY 2014-15, Energy Efficiency Services Limited (EESL) has carried out street light installations across the following States and Union Territories, with the state-wise installation details recorded as of March 31, 2025 shown below: So far, the 2015 launched Street Lighting National Programme (SLNP) has installed 13.1 million LED streetlights. As a result, 8.8 billion kWh of electricity has been saved, leading to approximately Rs 61.78 billion in monetary savings…

Status of Hydro Electric Projects (above 25 MW) -under implementation and stalled
Author: PPD Team Date: 18/04/2025 List of Hydro Electric Projects (above 25 MW) -under implementation India has 26 hydroelectric projects (HEPs) with a total capacity of 13,238 MW that are under construction. Currently, there are 209 operational HEPs with a combined installed capacity of 42,983 MW. Some projects like Teesta-III, Teesta-V, Khandong, and Malana-II are generating less or no power due to flash floods and cloudbursts, causing outages. Developers are working on improving plant efficiency…

India surpasses 200 GW renewable energy milestone
Author: PPD Team Date: 15/10/2024 India has crossed a major milestone in its renewable energy journey, with the nation’s total renewable energy capacity reaching 201.45 GW as of October 10, 2024, according to the Central Electricity Authority (CEA). When including the 8,180 MW of nuclear power, non-fossil fuel-based energy now accounts for nearly half of India’s total installed electricity generation capacity, which stands at 452.69 GW. Solar power leads India’s renewable energy contributions, generating 90.76…

Status of solar parks and UMREPPs across India as of March 2025
Author: PPD Team Date: 22/05/2025 This table shows the current status of 55 solar parks and Ultra Mega Renewable Energy Power Projects (UMREPPs) across 15 states in India. It captures capacity, expected or actual completion dates, and key development milestones such as transmission progress, land acquisition, and commissioning status. Abbreviations used: APGENCO: Andhra Pradesh Power Generation Corporation APSPCL: Andhra Pradesh Solar Power Corporation Private Limited CEA: Central Electricity Authority CTU: Central Transmission Utility CTUIL: Central…

India’s short-term power trading market grows 12% in FY24
Author: PPD Team Date: 07/11/2024 Power trading in India’s short-term market rose by 12% in FY24, reaching 218.22 billion units (BU) from 194.35 BU in FY23, as reported by the Central Electricity Regulatory Commission (CERC). Short-term transactions, including deviation settlement mechanism (DSM) volumes, consist of contracts under one year, executed bilaterally or through power exchanges, representing 12.5% of the country’s total electricity generation. The remaining 87.5% was sourced through long-term contracts and intra-state transactions…

10,273 ckm of Lines and 71,197 MVA Added: T&D in 2024
Author: PPD Team Date: 06/01/2025 Year-end review: Power transmission and distribution in India National Electricity Plan 2023-2032 The Government of India has finalized the National Electricity Plan for the period 2023-2032 to address a projected peak demand of 458 GW by 2032, with an estimated total investment of Rs 9.15 trillion. In the new plan, the transmission network will grow from 491,000 ckm in 2024 to 648,000 ckm by 2032, while transformation capacity will increase…

Street light installations across States and Union Territories
Author: PPD Team Date: 15/04/2025 Since FY 2014-15, Energy Efficiency Services Limited (EESL) has carried out street light installations across the following States and Union Territories, with the state-wise installation details recorded as of March 31, 2025 shown below: So far, the 2015 launched Street Lighting National Programme (SLNP) has installed 13.1 million LED streetlights. As a result, 8.8 billion kWh of electricity has been saved, leading to approximately Rs 61.78 billion in monetary savings…

Status of Hydro Electric Projects (above 25 MW) -under implementation and stalled
Author: PPD Team Date: 18/04/2025 List of Hydro Electric Projects (above 25 MW) -under implementation India has 26 hydroelectric projects (HEPs) with a total capacity of 13,238 MW that are under construction. Currently, there are 209 operational HEPs with a combined installed capacity of 42,983 MW. Some projects like Teesta-III, Teesta-V, Khandong, and Malana-II are generating less or no power due to flash floods and cloudbursts, causing outages. Developers are working on improving plant efficiency…

India surpasses 200 GW renewable energy milestone
Author: PPD Team Date: 15/10/2024 India has crossed a major milestone in its renewable energy journey, with the nation’s total renewable energy capacity reaching 201.45 GW as of October 10, 2024, according to the Central Electricity Authority (CEA). When including the 8,180 MW of nuclear power, non-fossil fuel-based energy now accounts for nearly half of India’s total installed electricity generation capacity, which stands at 452.69 GW. Solar power leads India’s renewable energy contributions, generating 90.76…

Status of solar parks and UMREPPs across India as of March 2025
Author: PPD Team Date: 22/05/2025 This table shows the current status of 55 solar parks and Ultra Mega Renewable Energy Power Projects (UMREPPs) across 15 states in India. It captures capacity, expected or actual completion dates, and key development milestones such as transmission progress, land acquisition, and commissioning status. Abbreviations used: APGENCO: Andhra Pradesh Power Generation Corporation APSPCL: Andhra Pradesh Solar Power Corporation Private Limited CEA: Central Electricity Authority CTU: Central Transmission Utility CTUIL: Central…