RenewSys to supply 125 MWp TOPCon modules to ENGIE
Author: PPD Team Date: March 3, 2026
Author: PPD Team Date: March 3, 2026
RenewSys India Pvt. Ltd. has signed a module supply agreement with ENGIE for the delivery of 125 MWp of Tunnel Oxide Passivated Contact (TOPCon) photovoltaic (PV) modules for a solar project in Bikaner, Rajasthan. Shipments are scheduled between February and April 2026.
Under the agreement, RenewSys will supply its 132X G12R TOPCon glass-to-glass modules. The company stated that the modules are designed for high-temperature operating conditions and incorporate a low temperature coefficient to reduce performance losses under heat stress. The specifications are suited for utility-scale installations in Rajasthan’s arid climate and are intended to support stable generation over the project lifecycle.
ENGIE will deploy the modules at its upcoming Bikaner project as part of its renewable energy portfolio expansion in India, where it has been focusing on operational performance and long-term asset management.
Avinash Hiranandani, Vice Chairman and Managing Director of RenewSys, said the agreement reflects a shared focus on technology quality and reliability. He added that the supply of domestically manufactured advanced modules aligns with India’s clean energy objectives.
The featured photograph is for representation only.
Author: PPD Team Date: April 23, 2025 The Government of West Bengal laid the foundation stone for a new 1,600 MW thermal power project at Salboni in Paschim Medinipur district on April 21, 2025. JSW Energy Limited also commenced construction on the same day. The greenfield project will use supercritical or ultra-supercritical technology and have two units of 800 MW each. It is being developed at an estimated cost of Rs 160 billion. This plant…
Author: PPD Team Date: September 18, 2025 Power Grid Corporation of India Limited (POWERGRID) has been awarded the project to develop an inter-state transmission system under the tariff-based competitive bidding (TBCB) process. The Letter of Intent was issued to the company on 16 September 2025. The project, titled “Inter-regional (NR-WR) transmission system strengthening to relieve the loading of 765 kV Vindhyachal-Varanasi D/c line,” will be developed on a Build, Own, Operate and Transfer basis. The…
Author: PPD Team Date: May 30, 2025 The Ministry of New and Renewable Energy (MNRE) has called for Indian proposals under the EU-India Trade and Technology Council (TTC) for joint projects on Waste to Renewable Hydrogen Innovation. This initiative is part of Horizon Europe’s call HORIZON-CL5-2025-04-D2-13, launched under the EU-India Trade and Technology Council (TTC) Working Group 2. The programme aims to support the development of renewable hydrogen from biogenic waste, such as agricultural residues,…
Author: PPD Team Date: February 4, 2025 Fidra Energy, a European battery energy storage system (BESS) platform owned by EIG, has received planning consent to develop a 1.4GW battery storage project at Thorpe Marsh, Yorkshire. This will become the UK’s largest battery storage facility, capable of powering up to 800,000 homes during peak demand. The project was approved by Doncaster Council on 28 January 2025 and will feature lithium-ion battery systems supplied by Sungrow. A…
Author: PPD Team Date: September 12, 2024 The Ministry of New and Renewable Energy (MNRE) has unveiled draft guidelines for financial assistance and payment security under the ‘PM Surya Ghar—Muft Bijli Yojana‘ rooftop solar scheme. These guidelines focus on providing central financial assistance to residential consumers through Renewable Energy Services Company (RESCO) and Utility Led Aggregation (ULA) models. The scheme is set to run until March 31, 2027. Under the RESCO model, a third-party renewable…
Author: PPD Team Date: February 16, 2026 Patel Engineering Limited (PEL) reported consolidated revenue from operations of Rs 1,239 Cr in Q3 FY26, compared to Rs 1,206 Cr in Q3 FY25, reflecting a 2.81% year-over-year increase. Consolidated net profit for the quarter stood at Rs 71 Cr. As of December 31, 2025, the company’s order book was Rs 15,123 Cr. Consolidated operating earnings before interest, tax, depreciation and amortisation (EBITDA) for Q3 FY26 were Rs…