Renewable capacity (month-wise) – All India
Author: PPD Team Date: October 10, 2025
Author: PPD Team Date: October 10, 2025
All-India month-wise renewable energy capacity addition from Oct 2024 to Sep 2025. Source: MNRE’s Akshay Urja data.
Author: PPD Team Date: February 20, 2025 The following table presents a detailed state and Union Territory-wise breakdown of India’s power generation capacity as of December 31, 2024, categorized by energy sources (All figures in MW): The following table presents a detailed state and Union Territory-wise breakdown of India’s installed renewable energy capacity as of December 31, 2024 (All figures in MW): Source: Rajya Sabha answers
Author: PPD Team Date: November 7, 2024 Power trading in India’s short-term market rose by 12% in FY24, reaching 218.22 billion units (BU) from 194.35 BU in FY23, as reported by the Central Electricity Regulatory Commission (CERC). Short-term transactions, including deviation settlement mechanism (DSM) volumes, consist of contracts under one year, executed bilaterally or through power exchanges, representing 12.5% of the country’s total electricity generation. The remaining 87.5% was sourced through long-term contracts and…
Author: PPD Team Date: February 4, 2026 NTPC Green Energy Limited has declared the commercial operation of 125 MW solar power capacity under its 500 MW Bhadla Solar PV Project in Rajasthan. With this addition, the group’s installed capacity has increased to 8,813.25 MW. In a regulatory filing dated February 3, 2026, the company said the capacity located at Phalodi, Rajasthan, achieved commercial operation with effect from 00:00 hours on January 31, 2026. The declaration…
Author: PPD Team Date: October 22, 2024 JSW Neo Energy Limited (JSWNEL), a subsidiary of JSW Energy Limited, has acquired three special purpose vehicles (SPVs)—Hetero Wind Power Limited, Hetero Wind Power (Pennar) Private Limited, and Hetero Med Solutions Limited—from Hetero Labs Limited and Hetero Drugs Limited. These SPVs have a combined wind energy capacity of 125 MW. This acquisition aligns with JSW Neo Energy’s strategy to expand its renewable portfolio and supports its goal of…
Author: PPD Team Date: July 29, 2025 The Ministry of New and Renewable Energy (MNRE) has released a status update on biomass briquette and pellet manufacturing projects, reporting that 118 projects have been sanctioned under its support programme. Of these, 48 projects have completed inspections. Out of those, 32 have uploaded the required Stage-2 documentation to the designated BioURJ portal. Sixteen inspected projects are still pending document submission. In addition, four applicants have requested closure…
Author: PPD Team Date: August 14, 2025 The table below shows peak demand and average demand of electric power in the country during the last three years (All figures in MW). Source: Rajya Sabha questions