Similar Posts
NTPC begins 37.5 MW operations at Gujarat solar project
NTPC Renewable Energy Ltd (NTPC REL), a step-down subsidiary of NTPC Ltd, has commenced commercial operations of 37.5 MW capacity, the first part of its 200 MW Gujarat Solar PV Project in Sadla, Gujarat, effective December 21, 2024. This addition increases NTPC Group’s total installed and commercial capacity to 76,598.18 MW. NTPC aims to achieve…
NSE likely to waive transaction charges on electricity futures contracts
The National Stock Exchange (NSE) is likely to waive transaction charges on electricity futures contracts until December 31, 2025. The move is expected to promote participation in the newly launched electricity derivatives segment, according to people familiar with the matter. If implemented, the waiver will apply uniformly at the exchange level across all categories of…
- India | Generation | News
Government prepares Bill to open civil nuclear sector to private players
The winter session of Parliament will take up a proposal to allow private participation in the civil nuclear sector. The Bill is listed for introduction when the session begins on December 1. The proposal sits alongside the Atomic Energy Bill, 2025. This Bill outlines a framework for the use and regulation of atomic energy and…
PFC incorporates SPV for transmission project between SR Grid and ER Grid
Power Finance Corporation Ltd (PFC) has announced the incorporation of SR and ER Power Transmission Limited as a wholly owned subsidiary of PFC Consulting Ltd, according to its stock exchange filing dated August 22, 2025. The special-purpose vehicle has been created for the development of the “Inter-Regional Strengthening between SR Grid and ER Grid” project….
Sahaj Solar secures Rs 364.2 million solarisation project in Tripura
Sahaj Solar has won a contract from the Tripura Renewable Energy Development Agency (TREDA) to solarise 2 HP grid-connected agricultural pumps under the PM-KUSUM scheme’s Component C. The project involves designing, surveying, manufacturing, supplying, and commissioning 3 kWp grid-connected power plants with interfacing devices for the pumps. It also includes a five-year warranty, annual maintenance…
NTPC Green declares commercial operation of 91.6 MW solar capacity
NTPC Green Energy Limited has announced the commercial operation of a 91.6 MW segment of a solar power project in Andhra Pradesh. The capacity is part of a 250 MW solar photovoltaic (PV) project developed by Ayana Kadapa Renewable Power Private Limited, a subsidiary within the NTPC Green Energy group structure. In a regulatory filing…
