Advait Energy Transitions has secured an order for the supply of 24 F optical ground wire (OPGW) cables on a turnkey basis for the 400 KV Kurukshetra-Malerkotla transmission line.
The contract, awarded by NRSS XXXI (B) Transmission, includes both supply and installation under a build, own, and operate model.
The project is scheduled to be completed within seven months.