ARYA secures Rs 1 billion to develop CBG projects with IOCL and BPCL
Author: PPD Team Date: October 30, 2024
Author: PPD Team Date: October 30, 2024
ARYA, a subsidiary of GPS Renewables, has raised Rs 1 billion in mezzanine financing as part of a Rs 2 billion funding round aimed at establishing compressed biogas (CBG) projects in collaboration with Indian Oil Corporation Limited (IOCL) and Bharat Petroleum Corporation Limited (BPCL). The financing was provided by InCred Opportunities Fund and Spark Capital, supporting ARYA’s mission to advance biofuel production and contribute to India’s net zero objectives.
In the coming year, ARYA plans to expand its CBG capacity and strengthen its partnerships with key industry players, furthering India’s transition to sustainable energy sources. GPS Renewables, ARYA’s parent company, has previously raised Rs 4.11 billion in debt from Punjab National Bank, HDFC, and HSBC and secured $20 million in equity funding from SBICap Ventures’ Neev Fund II, Hivos-Triodos Fund, and Caspian Impact Investments. GPS Renewables currently operates over 100 biogas plants across India.
In August 2023, GPS Renewables expanded its expertise in waste-to-biogas technology with the acquisition of German-based Proweps Envirotech GmbH, a firm specializing in biogas production from municipal, industrial, and agricultural waste.
Author: PPD Team Date: October 8, 2025 The Ministry of Mines has released implementation guidelines for a Rs 15 billion incentive scheme approved by the Union Cabinet to promote critical mineral recycling. The scheme, part of the National Critical Mineral Mission, aims to build domestic capacity to extract critical minerals from secondary sources. Eligible feedstocks include e-waste, spent lithium-ion batteries, and other scrap materials. Both new and existing units involved in actual mineral extraction, rather…
Author: PPD Team Date: August 13, 2025 Tata Power will develop a 700 MW wind farm in Anantapur, Andhra Pradesh. The project will connect to the central grid and generate around 1,840 million units annually. The Rs 6,000 crore project is part of an MoU between Tata Power and the Andhra Pradesh government, signed in March 2025, to develop 7,000 MW of renewable capacity. Suzlon Energy will supply turbines from its upgraded Andhra Pradesh factory,…
Author: PPD Team Date: September 10, 2024 The Ministry of New and Renewable Energy (MNRE) has released a draft amendment to the Approved List of Models and Manufacturers (ALMM) List-II for solar photovoltaic (PV) cells, effective from April 1, 2026, to accommodate rising solar PV cell capacity. Under the new guidelines, projects must source their solar PV modules from manufacturers in ALMM List-I, and those modules must use PV cells from manufacturers listed in ALMM…
Author: PPD Team Date: July 7, 2025 INKEL Limited plans to develop renewable energy (RE) projects worth Rs 2 billion in Malappuram, Kerala. The initiative is part of a broader Rs 11.35 billion investment commitment aimed at accelerating infrastructure and clean energy growth in the state. Under Phase-I, INKEL will set up a 23.3 MW group captive solar project across 75 acres at the INKEL Greens Educity & Industrial Park in Malappuram district. This marks…
Author: PPD Team Date: October 30, 2024 Bharat Heavy Electricals Ltd (BHEL) reported a 23% increase in order inflows in the first half of FY25, reaching Rs 41.09 billion, up from Rs 33.48 billion in H1FY24. The power sector led the order bookings, contributing 93% of the inflows. As of September 30, 2024, BHEL’s outstanding order book stood at Rs 1.60 trillion, with 78.5% from the power sector, 19.1% from the industry sector, and 2.3%…
Author: PPD Team Date: January 9, 2026 Waaree Renewable Technologies Limited has informed the stock exchanges of a revision to the capacity and value of a previously announced solar project. The disclosure was made through a regulatory filing dated 8 January 2026. The revision relates to a project award first disclosed on 9 September 2025. The company stated that it has received a Letter of Award for a revised project capacity of 704 MWac and…