Sarus wins contract for 187.5 MW BESS at Maheswaram
Sarus Infrastructures has received a Letter of Award (LOA) from Telangana Power Generation Corporation Limited (TGGENCO) to develop a 187.5 MW/750 MWh standalone battery energy storage system (BESS) at the Maheswaram substation in Telangana. The project is valued at Rs 10.15 billion. The BESS will be connected at the 400/220 kV substation level and is required to support one full four-hour charge-discharge cycle daily. It will maintain a minimum annual availability of 95% and achieve…
