SWELECT commissions 110/33 kV pooling substation in Tamil Nadu
SWELECT Energy Systems Limited has announced the successful commissioning of its newly erected 110/33 kV Pooling Substation (PSS) at Sirungattur in the Tiruvannamalai district of Tamil Nadu. The facility was energised and brought into operation on April 16, 2026. The substation is equipped with a 1 x 50 MVA, 110/33 kV power transformer. It has been developed to provide 110 kV evacuation infrastructure for a 50 MW solar power project located within the Villupuram Operation…
