First stage of Waratah Super Battery begins operation in NSW
Akaysha Energy has brought the first 350 MW / 700 MWh of the Waratah Super Battery online. Commissioned by the New South Wales (NSW) Government and developed by Akaysha Energy, the facility is intended to act as a shock absorber for the state’s electricity grid during events such as heatwaves, lightning strikes and bushfires. The battery is located at the site of the former Munmorah coal-fired power station, about 100 kilometres north of Sydney. Its…
