NERGS-III revised: Kaying to replace Naying as pooling station
The pooling station for evacuating 426 MW from Heo and Tato-I hydro projects in Arunachal Pradesh has been shifted from Naying to Kaying due to land constraints, according to a revised plan under the North Eastern Region Generation Scheme-III (NERGS-III). NERGS-III is a transmission scheme to evacuate power from NEEPCO’s Heo (3×80 MW) and Tato-I (3×62 MW) hydroelectric projects located in Shi-Yomi district. The original plan included a 400/220 kV pooling station at Naying, a…
