|

EnBW completes foundation installations at 960MW He Dreiht offshore wind farm

EnBW has announced the completion of foundation installations for the 960MW He Dreiht offshore wind farm in the German North Sea. The installations were carried out over three months using the Thialf, one of the world’s largest floating cranes, operated by Heerema. During this period, the Thialf drove the monopiles into the seabed, setting the stage for the next construction phase. Each of the 64 steel foundations measures 70 meters in length, has a 9.2-meter…