India | Generation | News
CEA committee finds no significant damage from thermal plants operating at 55% MTL
A committee constituted by the Central Electricity Authority (CEA) to assess the wear and tear, operation and maintenance (O&M) requirements and plant lifespan implications of flexible and two-shift operation of thermal power plants has concluded that no significant damage can be attributed to operation at 55% Minimum Technical Load (MTL) with conservative ramp rates. The…
