Skip to content
Minimalist white P-shaped monogram logo for Power Peak Digest on a black background
  • Home
  • About us
  • NewsExpand
    • India
    • Global
  • AnalysisExpand
    • Features
    • Opinions and perspective
    • Data Insights
    • Energy Regulatory Updates
    • Deep Dive: Engineering and Innovation
    • Power Bytes
  • Subscribe
  • Contact Us
Minimalist white P-shaped monogram logo for Power Peak Digest on a black background

cable installation

  • Global | News

    DEME wins contract for cable installation at OranjeWind offshore wind farm in the Netherlands

    By October 28, 2024October 28, 2024

    Offshore contractor DEME has secured a contract to transport and install inter-array cables and secondary steel components for the 800 MW OranjeWind offshore wind farm in the Dutch North Sea. The wind farm, located 53 km from the Dutch coast, is a joint venture between RWE and TotalEnergies. DEME’s scope includes the installation of 114 km of inter-array cables connecting 53 foundations to the offshore substation. Scheduled to start in the second half of 2026,…

    Read More DEME wins contract for cable installation at OranjeWind offshore wind farm in the NetherlandsContinue

  • News
  • India
  • Global
  • Regulatory Updates
  • Power Bytes
  • Analysis
  • Features
  • Opinions and perspective
  • Data Insights
  • Regulatory Updates
  • Deep Dive

Contact Us
info@powerpeakdigest.com

Advertise With Us: advertising@powerpeakdigest.com

© 2025 Power Peak Digest. All rights reserved.

  • Home
  • About us
  • News
    • India
    • Global
  • Analysis
    • Features
    • Opinions and perspective
    • Data Insights
    • Energy Regulatory Updates
    • Deep Dive: Engineering and Innovation
    • Power Bytes
  • Subscribe
  • Contact Us
Search
  • ←
  • Contact Us
    Contact Form

  • Linkedin
  • X