Skip to content
Minimalist white P-shaped monogram logo for Power Peak Digest on a black background
  • Home
  • About us
  • NewsExpand
    • India
    • Global
  • AnalysisExpand
    • Features
    • Opinions and perspective
    • Data Insights
    • Energy Regulatory Updates
    • Deep Dive: Engineering and Innovation
    • Power Bytes
  • Subscribe
  • Contact Us
Minimalist white P-shaped monogram logo for Power Peak Digest on a black background

Bharat Heavy Electricals

  • India | News

    NHPC to commission Parbati-II hydroelectric project by March 2025

    By November 14, 2024November 14, 2024

    NHPC has announced that all four units of the Parbati-II Hydroelectric Project (800 MW) in Himachal Pradesh are expected to be operational by March 2025.  This run-of-the-river project is designed to harness the hydro potential of the lower reaches of the Parbati River. With a cost estimate of Rs 39.2 billion, it will feature four Pelton turbines, each with a 200 MW capacity, supplied by Bharat Heavy Electricals.

    Read More NHPC to commission Parbati-II hydroelectric project by March 2025Continue

  • News
  • India
  • Global
  • Regulatory Updates
  • Power Bytes
  • Analysis
  • Features
  • Opinions and perspective
  • Data Insights
  • Regulatory Updates
  • Deep Dive

Contact Us
info@powerpeakdigest.com

Advertise With Us: advertising@powerpeakdigest.com

© 2025 Power Peak Digest. All rights reserved.

  • Home
  • About us
  • News
    • India
    • Global
  • Analysis
    • Features
    • Opinions and perspective
    • Data Insights
    • Energy Regulatory Updates
    • Deep Dive: Engineering and Innovation
    • Power Bytes
  • Subscribe
  • Contact Us
Search
  • ←
  • Contact Us
    Contact Form

  • Linkedin
  • X