|

Parbati Hydroelectric Project (Stage-II)

  The Parbati Hydroelectric Project (Stage-II), being developed by NHPC Limited, is an 800 MW run-of-the-river (RoR) power initiative located on the Beas River in the Kullu district of Himachal Pradesh, approximately 260 km from Chandigarh. This project will harness the river in three stages: Stage I with 750 MW, Stage II with 800 MW, and Stage III with 501 MW. For Stage II, the infrastructure includes an 85 m high concrete gravity dam and…