|

SECI announces winners for 1.5 GW electrolyser manufacturing auction

The Solar Energy Corporation of India Limited (SECI) has announced the winners for tranche 2 (Envelope-2 opening) of its electrolyser manufacturing auction, totaling 1,500 MW in capacity. These projects will be developed under the Strategic Interventions for Green Hydrogen Transition (SIGHT) scheme, with awards divided across three different buckets. Bucket 1, the largest category, allocated 1,100 MW of electrolyser manufacturing capacity based on any stack technology. Waaree Energies secured the largest share with 300 MW,…

|

India’s renewable capacity reaches 190.57 GW, solar leads the way

In FY 2024, India added 11.5 GW of new utility-scale solar capacity, an 18% increase from the previous year, according to a report by JMK Research. The rooftop solar sector also showed impressive growth, with 3 GW installed, a 34% year-on-year increase. Wind capacity additions reached 3.25 GW, a 42.9% rise compared to FY 2023. The momentum continued in Q1 2024, with approximately 7.5 GW of utility-scale solar capacity added, five times the amount installed…

|

Thirteen companies shortlisted for subsidies under SIGHT scheme for green hydrogen electrolysers

Thirteen companies, including Adani Enterprises, Waaree Energies, Ohmium Operations, and Avaada Electrolysers, have been shortlisted to receive subsidies under the second tranche of the Strategic Interventions for Green Hydrogen Transition (SIGHT) scheme. This scheme, part of the National Green Hydrogen Mission, aims to promote the manufacturing of electrolysers in India. The SIGHT scheme has a total outlay of Rs 174.9 billion, with Rs 22 billion allocated for this second tranche. The Solar Energy Corporation of…

|

Proposed 1600 MW Thermal Power Project in Mirzapur faces environmental scrutiny

The proposed 1600 MW coal-based ultra supercritical thermal power project in Mirzapur, Uttar Pradesh, does not involve forest land for the main site, but 8.35 hectares of forest land is needed for a water pipeline and road access, the government informed Parliament. The National Green Tribunal (NGT) recently took suo motu notice of a report indicating that the 665 hectares of land for the project site is recorded as a ‘forest’ in a 1952 gazette…