TNPGCL to pilot 200 MW battery storage at thermal plant
Tamil Nadu Power Generation Corporation Ltd (TNPGCL) will install a 200 MW Battery Energy Storage System (BESS) at the North Chennai Thermal Power Station on a pilot basis. This is the first such use of battery storage with a coal-based plant in the state. The aim is to store electricity during low-demand periods and avoid frequent shutdowns. Restarting thermal units typically takes 10 to 12 hours. Continuous operation with BESS is expected to cut costs…
