PM-KUSUM: State-wise installation progress (as of January 31, 2026)
Author: PPD Team Date: March 4, 2026
Author: PPD Team Date: March 4, 2026
Source: MNRE, Lok Sabha Unstarred Question No. 854, February 4, 2026 (data as of January 31, 2026).
Author: PPD Team Date: May 20, 2025 Koraam New Energie, a subsidiary of Kosol Energie, has secured an order worth Rs 1.86 billion for the supply of 5,500 solar pumps under Component B of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) scheme. The order was placed by various nodal agencies. Of the total, 3,000 pumps have been allocated under Maharashtra’s Magel Tyala Saur Pump Yojana. Out of these, 2,200 pumps have already…
Author: PPD Team Date: September 29, 2024 Renewable Energy Capacity and Production (On-Grid and Off-Grid) In 2023, total global renewable energy capacity reached 3,864,522 MW, up from 1,698,295 MW in 2014, a more than twofold increase. Africa has also experienced growth, with a capacity of 62,066 MW in 2023, up from 32,511 MW in 2014. Countries like Angola, Ethiopia, and South Africa have led this surge, each achieving notable renewable capacity expansions. Angola, for example,…
Author: PPD Team Date: January 16, 2025 The Tripura Renewable Energy Development Agency (TREDA) has set a target of installing 10,895 solar-powered pumps for irrigation in rural farmlands under the PM KUSUM scheme. Of the target, 3,616 pumps have already been installed, providing irrigation to 7,232 acres of farmland and benefiting 3,616 marginal farmers. Work is underway for the installation of an additional 5,051 pumps, with steps being taken to establish the remaining 2,264 pumps…
Author: PPD Team Date: November 24, 2025 India’s energy storage sector has seen a sharp rise in tender activity from 2018 to 2025. A total of 138 tenders covered 51 GW of renewable energy capacity and 196 GWh of energy storage capacity. Pumped storage projects account for 114 GWh, and battery systems account for 81 GWh. Table: India’s energy storage tender trends (2018–25): Source: India Energy Storage Alliance More than 30 tenders with 41.7 GWh…
Author: PPD Team Date: December 23, 2025 Saatvik Green Energy Limited said its material subsidiary, Saatvik Solar Industries Private Limited, has received and accepted an order worth Rs 486 crore from a domestic independent power producer and engineering, procurement, and construction player for the supply of solar photovoltaic modules. The commercial order is scheduled to be executed by December 2026. Separately, Saatvik Green Energy Limited has received an order from Maharashtra State Electricity Distribution Co….
Author: PPD Team Date: May 22, 2025 This table shows the current status of 55 solar parks and Ultra Mega Renewable Energy Power Projects (UMREPPs) across 15 states in India. It captures capacity, expected or actual completion dates, and key development milestones such as transmission progress, land acquisition, and commissioning status. Abbreviations used: APGENCO: Andhra Pradesh Power Generation Corporation APSPCL: Andhra Pradesh Solar Power Corporation Private Limited CEA: Central Electricity Authority CTU: Central Transmission Utility…