PFC and JBIC sign loan agreement for bamboo-based bio ethanol project in Assam
Author: PPD Team Date: September 1, 2025
Author: PPD Team Date: September 1, 2025
Power Finance Corporation Limited (PFC) has signed a loan agreement worth about Rs 32 billion with the Japan Bank for International Cooperation (JBIC) to fund a bamboo-based bio ethanol and chemicals project in Assam.
The financing will support Assam Bio Ethanol Private Limited’s second-generation plant, which will use bamboo as feedstock to produce bioethanol and chemicals.
The agreement was signed under JBIC’s Global Action for Reconciling Economic Growth and Environmental Preservation (GREEN) initiative. The loan totals up to JPY 60 billion, with JBIC contributing JPY 36 billion. It is co-financed by Sumitomo Mitsui Banking Corporation, The Joyo Bank, Kansai Mirai Bank, and Kiraboshi Bank. JBIC will also provide a guarantee for the portion arranged by private financial institutions.
The project is located in Golaghat district, Assam. Assam Bio Ethanol Private Limited will produce biofuel using bamboo sourced from the Northeastern states and sell bioethanol for blending with gasoline. The project is being supported through the credit line signed between JBIC and PFC in January 2025 for renewable energy and next-generation energy supply projects.
India’s biofuel policy targets 20 percent ethanol blending (E20) by 2025. The Assam project supports this goal and the Act East Policy for Northeastern growth. The financing will boost bamboo demand, raise farmer incomes, and support climate targets through lower-impact ethanol.
Author: PPD Team Date: September 19, 2025 Serentica Renewables has entered into a power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) for 100 megawatts (MW) of round-the-clock renewable supply. The company stated that this is the country’s first “load-following” PPA, developed in consultation with SECI and state distribution companies (DISCOMs) to align with the seasonal load profile of the offtakers. The agreement requires Serentica to meet 80 per cent of the…
Author: PPD Team Date: December 5, 2024 US-based Green & Clean Power (GCP) has secured $300 million in debt and equity financing to develop a solar energy generation and battery storage facility in Osceola, Arkansas. The funding includes $165 million in construction debt financing from KfW IPEX-Bank, with market advisory from Aurora Energy Research, and an additional $100 million in takeout financing from the Arkansas Teacher Retirement System (ATRS). The 500-acre solar facility is expected…
Author: PPD Team Date: October 10, 2025 KPI Green Energy Limited announced that its subsidiary, Sun Drops Energia Private Limited, has been awarded Letters of Award for a 100 MW solar power project under the Captive Power Producer (CPP) segment. The project will be executed on a turnkey basis under the Domestic Content Requirement (DCR) module category, covering supply, service, and operations & maintenance (O&M) for the project’s operational life. Additionally, KPI Green Energy has…
Author: PPD Team Date: October 24, 2024 The Global Energy Alliance for People and Planet (GEAPP) is partnering with the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) to establish a 450-500 MW solar park along the Bundelkhand Expressway. This pilot project aims to create a green energy corridor across the expressway, with approximately 450 MW of solar power installed on the expressway’s designated land area, spanning 15-20 meters on both sides. The project aims to…
Author: PPD Team Date: August 7, 2025 Juniper Green Energy has commissioned 25 MW of wind capacity at Dev Bhumi Dwarka, Gujarat. The plant is part of its 50 MW wind power project being developed through subsidiary Juniper Green Beam Private Limited. This milestone was reached nearly three months before the scheduled commercial operation date of October 17, 2025. The full 50 MW project is backed by a power purchase agreement with Gujarat Urja Vikas…
Author: PPD Team Date: June 30, 2025 Union Minister for New and Renewable Energy, Shri Pralhad Joshi, inaugurated a 5 GWh Battery Energy Storage Systems (BESS) manufacturing facility in Bidadi Industrial Area, Bengaluru. The fully automated plant, developed by PACE Digitek, is among the largest in the country. The plant’s automated cell-to-pack assembly line is designed for precision and high efficiency, with minimal human intervention. India’s storage requirement is projected to reach 411.4 GWh by…